Made a map or mod? Announce it in this forum!
Moderator: Moderators
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
Wilsons right At0mic

I am just telling you guys whats going on.
Jesus built us a bridge, with 2 boards and 3 nails.
-
lizardkid
- Windows Zealot
- Posts: 3672
- Joined: Fri Mar 19, 2004 7:16 pm
- Location: Helena MT
Post
by lizardkid »
well i agree with At0miC that we don't need to know every detail of when you can map or not, but screenies of new levels are ok...
-
m4rine
- Major General
- Posts: 714
- Joined: Fri Apr 11, 2003 5:28 pm
- Location: UK
Post
by m4rine »
silver wrote:moh radiant has got SO MUCH silly bugs and other stuff...
oooh yes dont get me started, i really hope moh pa has better mod support, doubt it though...
"We must become the change we want to see in the world" (Mahatma Gandhi)
-
PsychoE
- Captain
- Posts: 243
- Joined: Mon Oct 21, 2002 7:40 pm
Post
by PsychoE »
This is looking interesting. I will be watching closely and if I have any idea's, I will pipe up.
Maybe on one of the levels of the building, you could have a locker room/storage room with enough space for someone to hide in the lockers maybe.
PSYCHO - Who you callin a PSYCHO?

-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
PsychoE wrote:This is looking interesting. I will be watching closely and if I have any idea's, I will pipe up.
Maybe on one of the levels of the building, you could have a locker room/storage room with enough space for someone to hide in the lockers maybe.
Cool

Maybe I will

Jesus built us a bridge, with 2 boards and 3 nails.
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
Should the fourth floor be the size of three floors or just two like the second floor??
Jesus built us a bridge, with 2 boards and 3 nails.
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
Why do I keep getting invisible textures???
Jesus built us a bridge, with 2 boards and 3 nails.
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
The fourth floor should be finished by thursday, and I will give some screenshots of it

Blue60007's elevator is ALMOST finished
I really need to know why I have invisible textures

Jesus built us a bridge, with 2 boards and 3 nails.
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
I fixed the texture thing

I'm going to make something like a conveyer belt only a little bit different, I'll send screenshots of it when its finished

Jesus built us a bridge, with 2 boards and 3 nails.
-
Mj
- Map Reviewer
- Posts: 1394
- Joined: Sun Apr 25, 2004 3:36 pm
- Location: England
Post
by Mj »
To get rid of invisible textures, select the offending brush, and select grid size 1, then Ctrl + G (snap to grid). I think that should work

-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
Thats what I did Mj, and it worked

Jesus built us a bridge, with 2 boards and 3 nails.
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
Are there any good sounds I could add to the conveyer belt and the stamper??
Jesus built us a bridge, with 2 boards and 3 nails.
-
At0miC
- General
- Posts: 1164
- Joined: Fri Feb 27, 2004 11:29 pm
- Location: The Netherlands
Post
by At0miC »
If you can't find nice sounds in mohaa, you can add custom sounds
Put them in main/sound/'mymap'/
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
OK

, but how would you execute them??
Jesus built us a bridge, with 2 boards and 3 nails.
-
MasterMind
- Major
- Posts: 316
- Joined: Thu Jul 15, 2004 12:10 am
Post
by MasterMind »
Alright I've finished the conveyer belt finally, I just have to add a couple of things and the fourth floor is done.

Jesus built us a bridge, with 2 boards and 3 nails.