Posted: Fri Dec 31, 2004 2:34 pm
We could work in shifts;
one makes the basic stuff some Terrain and water,
and posts the *.map file.
someone else downloads the map and edits it. (just adds some new stuff)
he has one day to do his stuff
then he uploads his new *.map.
In that day nobody else does any changes to the map.
and so on.
It think it is worth a try.
We could assign different days to different people.
If there 7 people, everyone gets a day in the week.
The shift changes between 21:00 and 22:00
And every *.map file would be saved.The names could be simple dotMAP_31_12_04.map or something like that.
Do you think this could work?
hmm, UDT stands for ???? (i know, i am stupid)
one makes the basic stuff some Terrain and water,
and posts the *.map file.
someone else downloads the map and edits it. (just adds some new stuff)
he has one day to do his stuff
then he uploads his new *.map.
In that day nobody else does any changes to the map.
and so on.
It think it is worth a try.
We could assign different days to different people.
If there 7 people, everyone gets a day in the week.
The shift changes between 21:00 and 22:00
And every *.map file would be saved.The names could be simple dotMAP_31_12_04.map or something like that.
Do you think this could work?
hmm, UDT stands for ???? (i know, i am stupid)