Page 1 of 1

Time??

Posted: Fri May 02, 2003 2:06 pm
by Snake
Howe long to compile a map with a visdatasize of 388.000 with datail brushes?
And what are the best options to use for a final compile?
Here are some screenshots from my first map:
http://www.dodstudios.net/uploads/uploads/3..jpg
http://www.dodstudios.net/uploads/uploads/4..jpg
http://www.dodstudios.net/uploads/uploads/9...jpg
http://www.dodstudios.net/uploads/uploads/5...jpg

depends

Posted: Fri May 02, 2003 3:54 pm
by tltrude
It depends on the size of your computer. I would think, less than 8 hours.

Looks nice!

Posted: Fri May 02, 2003 7:17 pm
by nihilo
very nice map...

Compiling time is pretty variable, and things such as degenerate planes will make it take a whole lot longer than you might think. 8 hours sounds right, though.

Posted: Fri May 02, 2003 7:44 pm
by Snake
And what are the options to use for a final compile?